Facility: PRODUCTION OF HYDROCARBONS
Investor: ASCENT resources d.o.o.
Phase: Conceptual design
Year: 2013

INFRASTRUCTURE FACILITIES:
1. Pg-10 and Pg-11A holes
2. Connection of Pg-10 and Pg-11A wells with CPP
3. New CPP
4. Gas pipeline from CPP to Methanol plant
5. Methanol-MRP Lendava high-pressure gas pipeline