March 2, 2021 Object: STEAM LINE 11barg MELAMIN KOČEVLJE Investor: Melamin kemična tovarna... STEAM LINE 11barg MELAMIN KOČEVLJE
March 2, 2021 Object: STEAM LINE 4,5barg – MELAMIN KOČEVLJE Investor: Melamin kemična... STEAM LINE 4,5barg – MELAMIN KOČEVJE
July 1, 2017 Object: REMOVAL OF METANOL FACTORY EQUIPMENT Investor: Methanol d.o.o. Phase:... REMOVAL OF METANOL FACTORY EQUIPMENT
September 1, 2014 Object:: REMOVAL OF OIL TANKS Investor: GEA d.d. Phase: Conceptual... REMOVAL OF OIL TANKS
May 1, 2014 Facility: BLOCK 6 in TE Šoštanj, COOLING AND SERVICE WATER,... BLOCK 6 in TE Šoštanj, COOLING AND SERVICE WATER, INSTRUMENTAL AND SERVICE AIR
July 1, 2013 Object: TREMINAL FOR PETROLEUM PORT II Investor: PORT OF KOPER... TREMINAL FOR PETROLEUM PORT II
July 1, 2013 PIPING ANALYSIS OF COMPRESSOR STATION ASME B31.3 pipeline analysis was... PIPING ANALYSIS OF COMPRESSOR STATION
July 1, 2013 Object: TANKS 500 m³, 250 m³ and 40 m³ for... TANKS 500 m³, 250 m³ and 40 m³ for vegetable oil
September 1, 2012 Object: STIRENA STORAGE V 300 TANK TANKS Investor: LUKA KOPER... STIRENA STORAGE V 300 TANK TANKS
June 1, 2012 Object: COREX Gas based MIDREX DR Plant Phase: Final design... COREX Gas based MIDREX DR Plant
August 1, 2011 Object: Biogas producing plant Keter Organica Investor: Keter Organica d.o.o.... Biogas producing plant Keter Organica
September 1, 2010 Object: CONSTRUCTION OF THE NEW F-4 FACTORY FOR FORMALDEHYDE PRODUCTION... CONSTRUCTION OF THE NEW F-4 FACTORY FOR FORMALDEHYDE PRODUCTION
July 1, 2009 Sugar Reception Facility – Facility 16.3; ORMOŽ Investor: PFEIFER &... Sugar Reception Facility – Facility 16.3; ORMOŽ
May 1, 2009 Object: REPLACEMENT FACTORY FORMALDEHYDE F-2 Investor: NAFTA PETROCHEM Phase: Conceptual... REPLACEMENT FACTORY FORMALDEHYDE F-2