Object:: REMOVAL OF OIL TANKS
Investor: GEA d.d.
Phase: Conceptual design, basic design for building permit
Year: 2013, 2014
Scope of work:
Demolition projects conceptual design and basic design for building permit:
– 10 tanks with a capacity of 250 m3
– 6 x 500 m3 tanks
– reservoirs within the coastal zone
Process management (project conditions, approvals) and building permit obtained.