PIPE CONNECTIONS 2 ETHYLHEXANES …
Facilities: – PIPE CONNECTIONS 2 ETHYLHEXANES – REPLACE FERMENTOR CONNECTIONS F2 AND F3 – DEMI WATER PIPE CONNECTIONS Investor: LEK […]
Facilities: – PIPE CONNECTIONS 2 ETHYLHEXANES – REPLACE FERMENTOR CONNECTIONS F2 AND F3 – DEMI WATER PIPE CONNECTIONS Investor: LEK […]
Object:: REMOVAL OF OIL TANKS Investor: GEA d.d. Phase: Conceptual design, basic design for building permit Year: 2013, 2014 Scope […]
Facility: BLOCK 6 in TE Šoštanj, FIRE PROTECTION SYSTEM Investor: Šoštanj Thermal Power Plant d.o.o. Phase: Final design Year: 2013, […]
Facility: BLOCK 6 in TE Šoštanj, COOLING AND SERVICE WATER, INSTRUMENTAL AND SERVICE AIR Investor: Šoštanj Thermal Power Plant d.o.o. […]
Object:: Pipeline DN200 to MRP Lendava Investor: ASCENT resources d.o.o. Phase: Conceptual design Year: 2014 Scope of works: – Conceptual […]