LPG METERING LINE RECONSTRUCTION – LPG STORAGE ŠTORE
Object: LPG METERING LINE RECONSTRUCTION – LPG STORAGE ŠTORE Investor: PETROL d.d. Phase: Final design Year: 2019 Project content: Reconstruction […]
Object: LPG METERING LINE RECONSTRUCTION – LPG STORAGE ŠTORE Investor: PETROL d.d. Phase: Final design Year: 2019 Project content: Reconstruction […]
Object: DISPOSAL OF LPG WAREHOUSE AT TRBOVLJE – POLAJ Investor: DEPARTMENT OF SLOVENIAN REPUBLIC FOR GOODS RESERVES Phase: Final design […]
Object: GAS SEPARATOR S-02 Investor: PETROL GEOTERM d.o.o. Phase: PZI Year: 2017 Facilities: inlet pressure 210 bar from the gas […]
Object: RECONSTRUCTION OF THE COMPRESSOR INTAKE AND PRESSURE SIDE ON CPP Investor: PETROL GEOTERM d.o.o. Phase: PZI Year: 2016 Scope […]
Facility: TRIPOLI SOUTH POWER PLANT – GAS REDUCING STATION Investor: GENERAL ELECTRICITY COMPANY OF LIBYA Phase: Final design Year: 2016 […]
Object:: LPG TERMINAL / PLATE PORT Investor: PPD Phase: IDZ, PZI Year: 2015 Scope of work LPG tanks 6x 3000m3 […]
Object:: Pipeline DN200 to MRP Lendava Investor: ASCENT resources d.o.o. Phase: Conceptual design Year: 2014 Scope of works: – Conceptual […]
Facility: PRODUCTION OF HYDROCARBONS Investor: ASCENT resources d.o.o. Phase: Conceptual design Year: 2013 INFRASTRUCTURE FACILITIES: 1. Pg-10 and Pg-11A holes […]
Object: PG-10 Pipeline – CPP Investor: ASCENT SLOVENIA LIMITED LENDAVA Phase: Conceptual design, basic design for building permit, final design […]