December 6, 2022 Investor: VAOS Phase: Final design Year: 2021 Project content: Replacement... REPLACEMENT OF EXISTING 0.8 km PIPELINE SEGMENT, PHASE I
December 6, 2022 Phase: Final design Year: 2021 Project content: 3D model preparation... LIQUID CARGO TERMINAL OF OTF MOSTAR, 3D MODEL AND ISOMETRY PREPARATION
December 6, 2022 Investor: PETROL d.d. Phase: Basic design, Basic design for building... CANOPY, ACCESS SURFACES, COOLING, FIRE EXTINGUISHING INSTALLATIONS AND FIRE PROTECTION ALARM SYSTEM, RAILWAY LOADING/UNLOADIN STATION ZALOG JUG
December 6, 2022 Investor: Agency of the Republic of Slovenia for Commodity Reserves... REMOVAL OF UNDERGROUND TANKS, SND CELJE
March 2, 2021 Object: REPLACEMENT AND UPGRADE OF LOADING/UNLOADING POINTS – PORT II,... REPLACEMENT AND UPGRADE OF LOADING/UNLOADING POINTS – PORT II, PORT OF KOPER
March 2, 2021 Object: FIRE INSTALLATIONS REPLACEMENT – TANK E1, SND LENDAVA Investor:... FIRE INSTALLATIONS REPLACEMENT – TANK E1, SND LENDAVA
March 2, 2021 Object: TANK BOTTOM REPLACEMENT ON RO1-04, PORT OF LUKA KOPER... TANK BOTTOM REPLACEMENT ON RO1-04, PORT OF LUKA KOPER
March 2, 2021 Object: STEAM LINE 11barg MELAMIN KOČEVLJE Investor: Melamin kemična tovarna... STEAM LINE 11barg MELAMIN KOČEVLJE
March 2, 2021 Object: STEAM LINE 4,5barg – MELAMIN KOČEVLJE Investor: Melamin kemična... STEAM LINE 4,5barg – MELAMIN KOČEVJE
March 2, 2021 Object: LPG METERING LINE RECONSTRUCTION – LPG STORAGE ŠTORE Investor:... LPG METERING LINE RECONSTRUCTION – LPG STORAGE ŠTORE
February 10, 2021 Object: REPLACEMENT OF FIRE INSTALLATIONS OF TANKS B-2 AND B-3,... REPLACEMENT OF FIRE INSTALLATIONS OF TANKS B-2 AND B-3, SND LENDAVA
May 1, 2020 Object: FIRE PROTECTION INSTALATION REPLACEMENT – TANK R2, SND CELJE... FIRE PROTECTION INSTALATION REPLACEMENT – TANK R2, SND CELJE
June 1, 2019 Object: RIŽANA FIRE PUMP STATION AT PORT I, PORT of... RIŽANA FIRE PUMP STATION AT PORT I, PORT of KOPER
May 1, 2019 Object: DISPOSAL OF LPG WAREHOUSE AT TRBOVLJE – POLAJ Investor:... DISPOSAL OF LPG TERMINAL AT TRBOVLJE – POLAJ
April 1, 2019 Investor: LEK Pharmaceutical Company d. d., AI Lendava Unit Year:... LEK Pharmaceutical Company d. d., AI Lendava Unit
February 1, 2019 Object: FUEL OIL SUPPLY ZLITEN POWER PLANT Investor: GENERAL ELECTRICITY... FUEL OIL SUPPLY ZLITEN POWER PLANT
December 1, 2018 Object: RENOVATION OF THE FOAM PREPARATION UNIT Investor: LUKA KOPER... RENOVATION OF THE FOAM PREPARATION UNIT
July 1, 2018 Object: ADDING COMPONENTS TO FUELS IN SND ORTNEK Investor: DEPARTMENT... ADDING COMPONENTS TO FUELS IN SND ORTNEK
February 1, 2018 Object: INSTALLATION OF NEW SHIP LIQUID TRANSMITTING ARM ON THE... INSTALLATION OF NEW SHIP LIQUID TRANSMITTING ARM ON THE SILOS COAST PORT II AT KOPER PORT
November 1, 2017 Object: GAS SEPARATOR S-02 Investor: PETROL GEOTERM d.o.o. Phase: PZI... GAS SEPARATOR S-02
July 1, 2017 Object: REMOVAL OF METANOL FACTORY EQUIPMENT Investor: Methanol d.o.o. Phase:... REMOVAL OF METANOL FACTORY EQUIPMENT
May 1, 2017 Object: UPDATE OF FUEL RECEIVING AT EKO-NAFTA Investor: ZRSBR Phase:... UPDATE OF FUEL RECEIVING AT EKO-NAFTA
October 1, 2016 Object: RECONSTRUCTION OF THE COMPRESSOR INTAKE AND PRESSURE SIDE ON... RECONSTRUCTION OF THE COMPRESSOR INTAKE AND PRESSURE SIDE ON CPP
August 1, 2016 Facility: TRIPOLI SOUTH POWER PLANT – GAS REDUCING STATION Investor:... TRIPOLI SOUTH POWER PLANT – GAS REDUCING STATION
June 1, 2016 Object: KHOMS POWER PLANT – LFO TANKS 20,000 m3 Investor:... KHOMS POWER PLANT – LFO TANKS 20,000 m3
November 1, 2015 Object: TREMINAL FOR PETROLEUM PORT II- II PHASE Investor: LUKA... TERMINAL FOR PETROLEUM PORT II- II PHASE
May 1, 2015 Object:: LPG TERMINAL / PLATE PORT Investor: PPD Phase: IDZ,... LPG TERMINAL / PLATE PORT
November 1, 2014 Facilities: – PIPE CONNECTIONS 2 ETHYLHEXANES – REPLACE FERMENTOR CONNECTIONS... PIPE CONNECTIONS 2 ETHYLHEXANES …
September 1, 2014 Object:: REMOVAL OF OIL TANKS Investor: GEA d.d. Phase: Conceptual... REMOVAL OF OIL TANKS
July 1, 2014 Facility: BLOCK 6 in TE Šoštanj, FIRE PROTECTION SYSTEM Investor:... BLOCK 6 in TE Šoštanj, FIRE PROTECTION SYSTEM
May 1, 2014 Facility: BLOCK 6 in TE Šoštanj, COOLING AND SERVICE WATER,... BLOCK 6 in TE Šoštanj, COOLING AND SERVICE WATER, INSTRUMENTAL AND SERVICE AIR
March 1, 2014 Object:: Pipeline DN200 to MRP Lendava Investor: ASCENT resources d.o.o.... Pipeline DN200 to MRP Lendava
September 1, 2013 Facility: PRODUCTION OF HYDROCARBONS Investor: ASCENT resources d.o.o. Phase: Conceptual... PRODUCTION OF HYDROCARBONS
July 1, 2013 Object: TREMINAL FOR PETROLEUM PORT II Investor: PORT OF KOPER... TREMINAL FOR PETROLEUM PORT II
July 1, 2013 PIPING ANALYSIS OF COMPRESSOR STATION ASME B31.3 pipeline analysis was... PIPING ANALYSIS OF COMPRESSOR STATION
July 1, 2013 Object: TANKS 500 m³, 250 m³ and 40 m³ for... TANKS 500 m³, 250 m³ and 40 m³ for vegetable oil
January 1, 2013 Updating fire protection of Group 100 and 200 tanks located... RECONSTRUCTION OF FIRE PROTECTION GROUP 100 AND 200 TANKS
October 1, 2012 Object: SND Ortnek / Fire protection Investor: DEPARTMENT OF GOOD... SND Ortnek / Fire protection
September 1, 2012 Object: STIRENA STORAGE V 300 TANK TANKS Investor: LUKA KOPER... STIRENA STORAGE V 300 TANK TANKS
July 1, 2012 Object: SND Ortnek / new tanks R17 20,000 m³ and... SND Ortnek / new tanks R17 20,000 m³ and R18 10,000 m³
June 1, 2012 Object: COREX Gas based MIDREX DR Plant Phase: Final design... COREX Gas based MIDREX DR Plant
September 1, 2011 Object: PG-10 Pipeline – CPP Investor: ASCENT SLOVENIA LIMITED LENDAVA... PG-10 Pipeline – CPP
August 1, 2011 Object: Biogas producing plant Keter Organica Investor: Keter Organica d.o.o.... Biogas producing plant Keter Organica
September 1, 2010 Object: CONSTRUCTION OF THE NEW F-4 FACTORY FOR FORMALDEHYDE PRODUCTION... CONSTRUCTION OF THE NEW F-4 FACTORY FOR FORMALDEHYDE PRODUCTION
July 1, 2010 Object: PETROLEUM STORAGE Investor: Eko NAFTA d.o.o. Lendava Phase: Conceptual... PETROLEUM STORAGE
October 1, 2009 Object: UNLOADING TERMINAL PETROLEUM OIL DERIVATIVES II. Investor: LUKA KOPER... UNLOADING TERMINAL PETROLEUM OIL DERIVATIVES II.
July 1, 2009 Sugar Reception Facility – Facility 16.3; ORMOŽ Investor: PFEIFER &... Sugar Reception Facility – Facility 16.3; ORMOŽ
May 1, 2009 Object: RECONSTRUCTION OF HYDRAULIC NETWORK OF FUEL SND PETROL LENDAVA... RECONSTRUCTION OF HYDRAULIC NETWORK OF FUEL SND PETROL LENDAVA STORAGE
May 1, 2009 Object: REPLACEMENT FACTORY FORMALDEHYDE F-2 Investor: NAFTA PETROCHEM Phase: Conceptual... REPLACEMENT FACTORY FORMALDEHYDE F-2