Investor: PETROL d.d.

Phase: Basic design, Basic design for building permit, Final design

Year: 2021

Project content:

  • Existing situation evaluation
  • Roof construction, with access platform and mini folding bridges for access to wagon tanks
  • Reconstruction of fire protection
  • Fire protection alarm system