REPLACEMENT OF EXISTING 0.8 km PIPELINE SEGMENT, PHASE I
Investor: VAOS Phase: Final design Year: 2021 Project content: Replacement of existing pipeline segment
Investor: VAOS Phase: Final design Year: 2021 Project content: Replacement of existing pipeline segment
Phase: Final design Year: 2021 Project content: 3D model preparation Isometry preparation
Investor: PETROL d.d. Phase: Basic design, Basic design for building permit, Final design Year: 2021 Project content: Existing situation evaluation […]
Investor: Agency of the Republic of Slovenia for Commodity Reserves Phase: Final design Year: 2021 Project content: Existing situation evaluation […]
Object: REPLACEMENT AND UPGRADE OF LOADING/UNLOADING POINTS – PORT II, PORT OF KOPER Investor: LUKA KOPER Phase: Final design Year: […]
Object: TANK BOTTOM REPLACEMENT ON RO1-04, PORT OF LUKA KOPER Investor: LUKA KOPER, pristaniški in logični sistem d.d. Phase: Final […]
Object: FUEL OIL SUPPLY ZLITEN POWER PLANT Investor: GENERAL ELECTRICITY COMPANY OF LIBYA Phase: Final design Year: 2018-2019
Object: ADDING COMPONENTS TO FUELS IN SND ORTNEK Investor: DEPARTMENT OF SLOVENIAN REPUBLIC FOR GOODS RESERVES Phase: Conceptual design, basic […]
Object: INSTALLATION OF NEW SHIP LIQUID TRANSMITTING ARM ON THE SILOS COAST PORT II AT KOPER PORT Investor: LUKA KOPER […]
Object: UPDATE OF FUEL RECEIVING AT EKO-NAFTA Investor: ZRSBR Phase: Final design, as build Year: 2016,2017 Scope of works: – […]