Object: ADDING COMPONENTS TO FUELS IN SND ORTNEK
Investor: DEPARTMENT OF SLOVENIAN REPUBLIC FOR GOODS RESERVES
Phase: Conceptual design, basic design for building permit, final design
Year: 2017-2018

Project scope:
• 2x above ground tanks, V = 55m3 in concrete trap bowl
• 2x receiving unit for biodiesel from trucks with a flow rate of 50m3/h
• Pumping station with 2x pumps for the flow of biodiesel to loading islands 1, 2 and 3
• Biodiesel metering units for dosing it into the diesel at the loading islands 1, 2 and 3
• Pipe installations between tanks, pumping station and loading station