Object: INSTALLATION OF NEW SHIP LIQUID TRANSMITTING ARM ON THE SILOS COAST PORT II AT KOPER PORT
Investor: LUKA KOPER d.d.
Phase: conceptual design, basic design for building permit, final design
Year: 2016-2018
Description:
– New ship arm, dimension DN 300 for flow rate 2300 m3/h.
– Pipeline from new ship arm to existing pumping station Č1.