REPLACEMENT OF EXISTING 0.8 km PIPELINE SEGMENT, PHASE I
Investor: VAOS Phase: Final design Year: 2021 Project content: Replacement of existing pipeline segment
Investor: VAOS Phase: Final design Year: 2021 Project content: Replacement of existing pipeline segment
Phase: Final design Year: 2021 Project content: 3D model preparation Isometry preparation
Investor: PETROL d.d. Phase: Basic design, Basic design for building permit, Final design Year: 2021 Project content: Existing situation evaluation […]
Investor: Agency of the Republic of Slovenia for Commodity Reserves Phase: Final design Year: 2021 Project content: Existing situation evaluation […]
Object: REPLACEMENT AND UPGRADE OF LOADING/UNLOADING POINTS – PORT II, PORT OF KOPER Investor: LUKA KOPER Phase: Final design Year: […]
Object: FIRE INSTALLATIONS REPLACEMENT – TANK E1, SND LENDAVA Investor: Agency of the Republic of Slovenia for Commodity Reserves Phase: […]
Object: TANK BOTTOM REPLACEMENT ON RO1-04, PORT OF LUKA KOPER Investor: LUKA KOPER, pristaniški in logični sistem d.d. Phase: Final […]
Object: STEAM LINE 11barg MELAMIN KOČEVLJE Investor: Melamin kemična tovarna d.d. Kočevje Phase: Final design Year: 2020 Project content: Project […]
Object: STEAM LINE 4,5barg – MELAMIN KOČEVLJE Investor: Melamin kemična tovarna d.d. Kočevje Phase: Final design Year: 2019 Project content: […]
Object: LPG METERING LINE RECONSTRUCTION – LPG STORAGE ŠTORE Investor: PETROL d.d. Phase: Final design Year: 2019 Project content: Reconstruction […]