REPLACEMENT OF EXISTING 0.8 km PIPELINE SEGMENT, PHASE I
Investor: VAOS Phase: Final design Year: 2021 Project content: Replacement of existing pipeline segment
Investor: VAOS Phase: Final design Year: 2021 Project content: Replacement of existing pipeline segment
Phase: Final design Year: 2021 Project content: 3D model preparation Isometry preparation
Investor: PETROL d.d. Phase: Basic design, Basic design for building permit, Final design Year: 2021 Project content: Existing situation evaluation […]
Investor: Agency of the Republic of Slovenia for Commodity Reserves Phase: Final design Year: 2021 Project content: Existing situation evaluation […]
Object: FIRE PROTECTION INSTALATION REPLACEMENT – TANK R2, SND CELJE Investor: Agency of the Republic of Slovenia for Commodity Reserves […]