Skip to content
Nafting.

Nafting.

  • Home
  • About Us
  • Services
    • Design, supervision and consulting
    • BIM
    • Laser scanning
  • References
    • Oil derivatives
    • Pharmacy
    • Gas
    • Fire protection
    • Other
  • Contact
  • Slovenija
  • Anglija

Author: Robert Gonter

  • Home
  • Robert Gonter

REPLACEMENT OF EXISTING 0.8 km PIPELINE SEGMENT, PHASE I

December 6, 2022 Robert Gonter

Investor: VAOS Phase: Final design Year: 2021 Project content: Replacement of existing pipeline segment

2021, Oil derivatives

LIQUID CARGO TERMINAL OF OTF MOSTAR, 3D MODEL AND ISOMETRY PREPARATION

December 6, 2022December 6, 2022 Robert Gonter

Phase: Final design Year: 2021 Project content: 3D model preparation Isometry preparation

2021, Oil derivatives

CANOPY, ACCESS SURFACES, COOLING, FIRE EXTINGUISHING INSTALLATIONS AND FIRE PROTECTION ALARM SYSTEM, RAILWAY LOADING/UNLOADIN STATION ZALOG JUG

December 6, 2022 Robert Gonter

Investor: PETROL d.d. Phase: Basic design, Basic design for building permit, Final design Year: 2021 Project content: Existing situation evaluation […]

2021, Fire protection, Oil derivatives

REMOVAL OF UNDERGROUND TANKS, SND CELJE

December 6, 2022December 6, 2022 Robert Gonter

Investor: Agency of the Republic of Slovenia for Commodity Reserves Phase: Final design Year: 2021 Project content: Existing situation evaluation […]

2021, Oil derivatives, Uncategorized

REPLACEMENT AND UPGRADE OF LOADING/UNLOADING POINTS – PORT II, PORT OF KOPER

March 2, 2021March 2, 2021 Robert Gonter

Object: REPLACEMENT AND UPGRADE OF LOADING/UNLOADING POINTS – PORT II, PORT OF KOPER Investor: LUKA KOPER Phase: Final design Year: […]

2020, Oil derivatives, Projects

FIRE INSTALLATIONS REPLACEMENT – TANK E1, SND LENDAVA

March 2, 2021March 2, 2021 Robert Gonter

Object: FIRE INSTALLATIONS REPLACEMENT – TANK E1, SND LENDAVA Investor: Agency of the Republic of Slovenia for Commodity Reserves Phase: […]

2020, Fire protection

TANK BOTTOM REPLACEMENT ON RO1-04, PORT OF LUKA KOPER

March 2, 2021March 22, 2021 Robert Gonter

Object: TANK BOTTOM REPLACEMENT ON RO1-04, PORT OF LUKA KOPER Investor: LUKA KOPER, pristaniški in logični sistem d.d. Phase: Final […]

2020, Oil derivatives

STEAM LINE 11barg MELAMIN KOČEVLJE

March 2, 2021March 22, 2021 Robert Gonter

Object: STEAM LINE 11barg MELAMIN KOČEVLJE Investor: Melamin kemična tovarna d.d. Kočevje Phase: Final design Year: 2020 Project content: Project […]

2020, Other, Uncategorized

STEAM LINE 4,5barg – MELAMIN KOČEVJE

March 2, 2021March 2, 2021 Robert Gonter

Object: STEAM LINE 4,5barg – MELAMIN KOČEVLJE Investor: Melamin kemična tovarna d.d. Kočevje Phase: Final design Year: 2019 Project content: […]

2019, Other

LPG METERING LINE RECONSTRUCTION – LPG STORAGE ŠTORE

March 2, 2021 Robert Gonter

Object: LPG METERING LINE RECONSTRUCTION –  LPG STORAGE ŠTORE Investor: PETROL d.d. Phase: Final design Year: 2019 Project content: Reconstruction […]

2019, Gas

Posts navigation

Older posts

Nafting

NAFTING d.o.o.
Mlinska ulica 5
9220 Lendava, Slovenija

Copyright © 2023 Nafting. All rights reserved. Theme: Flash by ThemeGrill. Powered by WordPress