Object: STEAM LINE 11barg MELAMIN KOČEVLJE

Investor: Melamin kemična tovarna d.d. Kočevje

Phase: Final design

Year: 2020

Project content:

  • Project for DN100 steam pipelines with a total length of 350m
  • Design pressure: 11barg, Q = 5.000kg / h
  • Stress anayisis according to EN13480-5
  • Equipment connection load checking
  • Drawings for execution (pipe plan’s, steam collector, isometrics)