Object: STEAM LINE 11barg MELAMIN KOČEVLJE
Investor: Melamin kemična tovarna d.d. Kočevje
Phase: Final design
Year: 2020
Project content:
- Project for DN100 steam pipelines with a total length of 350m
- Design pressure: 11barg, Q = 5.000kg / h
- Stress anayisis according to EN13480-5
- Equipment connection load checking
- Drawings for execution (pipe plan’s, steam collector, isometrics)