Object: RIŽANA FIRE PUMP STATION AT PORT I, PORT of KOPER
Investor: LUKA KOPER d.d.
Phase: Final design
Year: 2019

Project Content:
• control of hidden conditions in a secret network
• Installation of fire pumps 2x355m3/h
• new pipe installations
• control and regulation
• Installation of a 700kVA diesel aggregate