Object: RECONSTRUCTION OF HYDRAULIC NETWORK OF FUEL SND PETROL LENDAVA STORAGE
Investor: Petrol d.o.o.
Phase: PZI
Year: 2009
The reconstruction of the hydrant network was dimensioned taking into account the needs of the F field expansion, with the possible expansion of the reservoir space to the right of A-5 and A-6 or to the right of group B-1 to B-3 or to the right of NR group E-1 and E- 2. The input data for the calculation are obtained from the situation of the planned reconstruction of the hydrant network, scheme and conditions for fire events, variants A, B and C. The program contains actual data on pipes, piping equipment and shut-off elements. Pressure drop control is calculated for variant A, B and C. In each variant, water consumption in the total volume of 844 m3/h is estimated at 9.98 bar, which represents the total capacity of the current Lendava Nafta fire pump station.