Object:: NEW TRUCK ISLAND 2 ON PORT II
Investor: LUKA KOPER
Phase: Basic design for building permit, final design
Year: 2013-14, 2016

Scope of work:

– New double sided loading island
– 5x loading lines (diesel, biodiesel and additive)
– Additive pump
– Reconstruction of train station, 4x filling arms with (diesel, biodiesel and additive)
– New biodiesel pumps