Object:: LPG TERMINAL / PLATE PORT
Investor: PPD
Phase: IDZ, PZI
Year: 2015

Scope of work LPG tanks 6x 3000m3 (D = 8m, L = 70m)
– Reception and dispatch equipment
– Truck loading station
– Railway loading/unloading station
Plans:
• Electro part
o Measurement, management and regulation
o Fire reporting and control of the fire system
• Machine part (machine technology part)