References
2021
REPLACEMENT OF EXISTING 0.8 km PIPELINE SEGMENT, PHASE I
Investor: VAOS Phase: Final design Year: 2021 Project content: Replacement of existing pipeline segment
LIQUID CARGO TERMINAL OF OTF MOSTAR, 3D MODEL AND ISOMETRY PREPARATION
Phase: Final design Year: 2021 Project content: 3D model preparation Isometry preparation
CANOPY, ACCESS SURFACES, COOLING, FIRE EXTINGUISHING INSTALLATIONS AND FIRE PROTECTION ALARM SYSTEM, RAILWAY LOADING/UNLOADIN STATION ZALOG JUG
Investor: PETROL d.d. Phase: Basic design, Basic design for building permit, Final design Year: 2021 Project content: Existing situation evaluation […]
REMOVAL OF UNDERGROUND TANKS, SND CELJE
Investor: Agency of the Republic of Slovenia for Commodity Reserves Phase: Final design Year: 2021 Project content: Existing situation evaluation […]
FIRE PROTECTION INSTALATION REPLACEMENT – TANK R2, SND CELJE
Object: FIRE PROTECTION INSTALATION REPLACEMENT – TANK R2, SND CELJE Investor: Agency of the Republic of Slovenia for Commodity Reserves […]
