Skip to content
Nafting.

Nafting.

  • Home
  • About Us
  • Services
    • Design, supervision and consulting
    • BIM
    • Laser scanning
  • References
    • Oil derivatives
    • Pharmacy
    • Gas
    • Fire protection
    • Other
  • Contact
  • Slovenija
  • Anglija

REPLACEMENT OF EXISTING 0.8 km PIPELINE SEGMENT, PHASE I

  • Home
  • Projects
  • Oil derivatives
  • REPLACEMENT OF EXISTING 0.8 km PIPELINE SEGMENT, PHASE I
REPLACEMENT OF EXISTING 0.8 km PIPELINE SEGMENT, PHASE I
December 6, 2022 Robert Gonter

Investor: VAOS

Phase: Final design

Year: 2021

Project content:

  • Replacement of existing pipeline segment

2021, Oil derivatives

Post navigation

LIQUID CARGO TERMINAL OF OTF MOSTAR, 3D MODEL AND ISOMETRY PREPARATION

Nafting

NAFTING d.o.o.
Mlinska ulica 5
9220 Lendava, Slovenija

Copyright © 2025 Nafting. All rights reserved. Theme: Flash by ThemeGrill. Powered by WordPress