Object: GAS SEPARATOR S-02

Investor: PETROL GEOTERM d.o.o.

Phase: PZI

Year: 2017

Facilities:

  • inlet pressure 210 bar from the gas well, outlet pressure 65-100 bar
  • gas Separator S-02 (MOP = 100bar)
  • pipe connections for gas flow measurement
  • connection to flare
  • drainage of condensate from S-02 into storage tanks
  • connection to gas lift
  • gas outlet to the DN150 pipeline, with gas flow mesurement
  • pipe supports