PRODUCTION OF HYDROCARBONS
Facility: PRODUCTION OF HYDROCARBONS Investor: ASCENT resources d.o.o. Phase: Conceptual design Year: 2013 INFRASTRUCTURE FACILITIES: 1. Pg-10 and Pg-11A holes […]
TREMINAL FOR PETROLEUM PORT II
Object: TREMINAL FOR PETROLEUM PORT II Investor: PORT OF KOPER Phase: Final design Year: 2013 Project scope: Piping Stress and […]
PIPING ANALYSIS OF COMPRESSOR STATION
PIPING ANALYSIS OF COMPRESSOR STATION ASME B31.3 pipeline analysis was performed for the needs of a foreign investor. Pipeline dimensions […]
TANKS 500 m³, 250 m³ and 40 m³ for vegetable oil
Object: TANKS 500 m³, 250 m³ and 40 m³ for vegetable oil Investor: GEA Oil Factory d.d. Slovenska Bistrica Phase: […]
RECONSTRUCTION OF FIRE PROTECTION GROUP 100 AND 200 TANKS
Updating fire protection of Group 100 and 200 tanks located in the eastern and central part of the Liquid Chemicals […]