References
2017
GAS SEPARATOR S-02
Object: GAS SEPARATOR S-02 Investor: PETROL GEOTERM d.o.o. Phase: PZI Year: 2017 Facilities: inlet pressure 210 bar from the gas […]
REMOVAL OF METANOL FACTORY EQUIPMENT
Object: REMOVAL OF METANOL FACTORY EQUIPMENT Investor: Methanol d.o.o. Phase: conceptual design, basic design for building permit Year: 2016-2017 Description […]
UPDATE OF FUEL RECEIVING AT EKO-NAFTA
Object: UPDATE OF FUEL RECEIVING AT EKO-NAFTA Investor: ZRSBR Phase: Final design, as build Year: 2016,2017 Scope of works: – […]
FILTER MAWAG …
Facilities: – FILTER MAWAG – ADDITIONAL COOLING IN FERMENTATION 2 – COLUMN SETTING 635 Investor: LEK dd; Lendava Phase: Final […]