BLOCK 6 in TE Šoštanj, COOLING AND SERVICE WATER, INSTRUMENTAL AND SERVICE AIR
Facility: BLOCK 6 in TE Šoštanj, COOLING AND SERVICE WATER, INSTRUMENTAL AND SERVICE AIR Investor: Šoštanj Thermal Power Plant d.o.o. […]
Facility: BLOCK 6 in TE Šoštanj, COOLING AND SERVICE WATER, INSTRUMENTAL AND SERVICE AIR Investor: Šoštanj Thermal Power Plant d.o.o. […]
Object:: Pipeline DN200 to MRP Lendava Investor: ASCENT resources d.o.o. Phase: Conceptual design Year: 2014 Scope of works: – Conceptual […]
Facility: PRODUCTION OF HYDROCARBONS Investor: ASCENT resources d.o.o. Phase: Conceptual design Year: 2013 INFRASTRUCTURE FACILITIES: 1. Pg-10 and Pg-11A holes […]
Object: TANKS 500 m³, 250 m³ and 40 m³ for vegetable oil Investor: GEA Oil Factory d.d. Slovenska Bistrica Phase: […]
Object: STIRENA STORAGE V 300 TANK TANKS Investor: LUKA KOPER d.d. Phase: Final design, as built Year: 2012 SCOPE: Project […]
Object: SND Ortnek / new tanks R17 20,000 m³ and R18 10,000 m³ Investor: DEPARTMENT OF GOODS RESERVES Phase: Conceptual […]
Object: PG-10 Pipeline – CPP Investor: ASCENT SLOVENIA LIMITED LENDAVA Phase: Conceptual design, basic design for building permit, final design […]
Object: CONSTRUCTION OF THE NEW F-4 FACTORY FOR FORMALDEHYDE PRODUCTION Investor: NAFTA PETROCHEM Phase: Conceptual design, basic design for building […]
Object: PETROLEUM STORAGE Investor: Eko NAFTA d.o.o. Lendava Phase: Conceptual design, basic design for building permit, final design, as built […]
Object: UNLOADING TERMINAL PETROLEUM OIL DERIVATIVES II. Investor: LUKA KOPER d.d Phase: Basic design for building permit, final design, as […]