PIPE CONNECTIONS 2 ETHYLHEXANES …
Facilities: – PIPE CONNECTIONS 2 ETHYLHEXANES – REPLACE FERMENTOR CONNECTIONS F2 AND F3 – DEMI WATER PIPE CONNECTIONS Investor: LEK […]
Facilities: – PIPE CONNECTIONS 2 ETHYLHEXANES – REPLACE FERMENTOR CONNECTIONS F2 AND F3 – DEMI WATER PIPE CONNECTIONS Investor: LEK […]
Object:: REMOVAL OF OIL TANKS Investor: GEA d.d. Phase: Conceptual design, basic design for building permit Year: 2013, 2014 Scope […]
Facility: BLOCK 6 in TE Šoštanj, FIRE PROTECTION SYSTEM Investor: Šoštanj Thermal Power Plant d.o.o. Phase: Final design Year: 2013, […]
Facility: BLOCK 6 in TE Šoštanj, COOLING AND SERVICE WATER, INSTRUMENTAL AND SERVICE AIR Investor: Šoštanj Thermal Power Plant d.o.o. […]
Object:: Pipeline DN200 to MRP Lendava Investor: ASCENT resources d.o.o. Phase: Conceptual design Year: 2014 Scope of works: – Conceptual […]
Facility: PRODUCTION OF HYDROCARBONS Investor: ASCENT resources d.o.o. Phase: Conceptual design Year: 2013 INFRASTRUCTURE FACILITIES: 1. Pg-10 and Pg-11A holes […]
Object: TREMINAL FOR PETROLEUM PORT II Investor: PORT OF KOPER Phase: Final design Year: 2013 Project scope: Piping Stress and […]
PIPING ANALYSIS OF COMPRESSOR STATION ASME B31.3 pipeline analysis was performed for the needs of a foreign investor. Pipeline dimensions […]
Object: TANKS 500 m³, 250 m³ and 40 m³ for vegetable oil Investor: GEA Oil Factory d.d. Slovenska Bistrica Phase: […]
Updating fire protection of Group 100 and 200 tanks located in the eastern and central part of the Liquid Chemicals […]