SND Ortnek / Fire protection
Object: SND Ortnek / Fire protection Investor: DEPARTMENT OF GOOD RESERVES Phase: Building permit documentation and final design Year: 2012 […]
Object: SND Ortnek / Fire protection Investor: DEPARTMENT OF GOOD RESERVES Phase: Building permit documentation and final design Year: 2012 […]
Object: STIRENA STORAGE V 300 TANK TANKS Investor: LUKA KOPER d.d. Phase: Final design, as built Year: 2012 SCOPE: Project […]
Object: SND Ortnek / new tanks R17 20,000 m³ and R18 10,000 m³ Investor: DEPARTMENT OF GOODS RESERVES Phase: Conceptual […]
Object: COREX Gas based MIDREX DR Plant Phase: Final design Year: 2012 Project scope: PIPING ANALYSIS of piping systems for […]
Object: PG-10 Pipeline – CPP Investor: ASCENT SLOVENIA LIMITED LENDAVA Phase: Conceptual design, basic design for building permit, final design […]
Object: Biogas producing plant Keter Organica Investor: Keter Organica d.o.o. Phase: Final design Year: 2011 For the needs of the […]
Object: CONSTRUCTION OF THE NEW F-4 FACTORY FOR FORMALDEHYDE PRODUCTION Investor: NAFTA PETROCHEM Phase: Conceptual design, basic design for building […]
Object: PETROLEUM STORAGE Investor: Eko NAFTA d.o.o. Lendava Phase: Conceptual design, basic design for building permit, final design, as built […]
Object: UNLOADING TERMINAL PETROLEUM OIL DERIVATIVES II. Investor: LUKA KOPER d.d Phase: Basic design for building permit, final design, as […]
Sugar Reception Facility – Facility 16.3; ORMOŽ Investor: PFEIFER & LANGEN d.o.o. Phase: Conceptual design, basic design for building permit, […]