RECONSTRUCTION OF THE COMPRESSOR INTAKE AND PRESSURE SIDE ON CPP
Object: RECONSTRUCTION OF THE COMPRESSOR INTAKE AND PRESSURE SIDE ON CPP Investor: PETROL GEOTERM d.o.o. Phase: PZI Year: 2016 Scope […]
Object: RECONSTRUCTION OF THE COMPRESSOR INTAKE AND PRESSURE SIDE ON CPP Investor: PETROL GEOTERM d.o.o. Phase: PZI Year: 2016 Scope […]
Facility: TRIPOLI SOUTH POWER PLANT – GAS REDUCING STATION Investor: GENERAL ELECTRICITY COMPANY OF LIBYA Phase: Final design Year: 2016 […]
Object: KHOMS POWER PLANT – LFO TANKS 20,000 m3 Investor: GENERAL ELECTRICITY COMPANY OF LIBYA Phase: Final design Year: 2016 […]
Object:: NEW TRUCK ISLAND 2 ON PORT II Investor: LUKA KOPER Phase: Basic design for building permit, final design Year: […]
Object: TREMINAL FOR PETROLEUM PORT II- II PHASE Investor: LUKA KOPER Phase: Final design, as build Year: 2015, 2016 Scope […]
Object:: GROUP 100 / PORT OF PLOČE Investor: PPD Phase: Conceptual design, basic design for building permit, final design Year: […]
Object:: LPG TERMINAL / PLATE PORT Investor: PPD Phase: IDZ, PZI Year: 2015 Scope of work LPG tanks 6x 3000m3 […]
Facilities: – PIPE CONNECTIONS 2 ETHYLHEXANES – REPLACE FERMENTOR CONNECTIONS F2 AND F3 – DEMI WATER PIPE CONNECTIONS Investor: LEK […]
Object:: REMOVAL OF OIL TANKS Investor: GEA d.d. Phase: Conceptual design, basic design for building permit Year: 2013, 2014 Scope […]
Facility: BLOCK 6 in TE Šoštanj, FIRE PROTECTION SYSTEM Investor: Šoštanj Thermal Power Plant d.o.o. Phase: Final design Year: 2013, […]